01 / Live-hall retrofit
Dense GPUs in an air-cooled hall
Add a 30–40 kW GPU cluster to a running Tier-III hall without taking the room offline.
- Direct-to-chip + rear-door HX
- In-row CDUs on existing chilled water
- Target PUE ≤ 1.2, zero downtime
Home / Scenarios
Representative scenarios, not client case studies. Realistic targets for each approach.
01 / Live-hall retrofit
Add a 30–40 kW GPU cluster to a running Tier-III hall without taking the room offline.
02 / Greenfield AI pod
~1 MW of GPU compute in a small envelope. Immersion beats air on both density and floor space.
Your build
Rack count, GPU model, and site. We'll come back with a sized approach.