Pillar 01 / Consult

Consulting

Feasibility, technology selection, and sizing before you buy. We model air, direct-to-chip, and immersion against your site.

Cooling design and thermal planning schematic

Feasibility study

Is liquid cooling worth it for your hall?

Technology selection

DLC, immersion, or rear-door HX for your workload.

Thermal sizing

CDU and loop sizing based on real GPU load.

Site audit

Review your MEP design before build-out.

Pillar 02 / Integrate

System integration

From purchase order to go-live. Install, fill, commission, and hand over a working loop.

Cooling system installation and commissioning schematic

Procurement

Sourcing, customs, and staging in India.

Installation

CDUs, manifolds, piping, and rack connections.

Fluid fill & test

Dielectric fill, pressure test, leak check.

Commissioning

Flow balance, controls tuning, acceptance testing.

Support

SLA cover and scheduled maintenance.

Pillar 03 / Supply

Supply

Fluids, CDUs, manifolds, and heat rejection hardware. Stock held in India for faster delivery.

Cooling components warehouse and delivery schematic

Dielectric fluids

Single-phase and DLC fluids, stocked locally.

CDUs & manifolds

70 kW to 2 MW+, in-row and in-rack.

RDHx & immersion

Rear-door HX and immersion tanks.

See the full product list.

Fluids, CDUs, and heat rejection hardware.

Browse products

How we work

Six steps to a commissioned loop.

01

Assess

Site, load, climate, budget.

02

Design

Technology choice and sizing.

03

Procure

Sourcing and staging.

04

Integrate

Install and fluid fill.

05

Commission

Balance and test.

06

Support

SLA and maintenance.

Get in touch early

The cooling decision drives everything else.

Rack layout, power, and building design all depend on it. Talk to us before you commit.